Personnel Management at Salvage Logging

Experiences after the storms "Vivian", "Wiebke" and "Lothar" have shown that storm damages can only be managed with a large personal input of all employees. Personnel can be supported by various measures to absorb their permanent workload. Next to personnel management guidelines (communication, stress relief) are concrete instruments such as the handling of extra work/overtime, relocation and assignment of supporting personnel as well as the use of foreign workers/contractors of importance.

Downloads

Fact sheets in German:

Local and time-related changes must be taken into account. The following leaflets serve as a first orientation and have to be adapted to the previously mentioned changes.

Abstract of the fact sheets:

General terms and conditions:

Current versions can be downloaded directly from the pages of the state companies and administrations. This ensures that they are always up to date. 

Forest Crises Management Advisory Guide

Back to the main page of the Forestry Crisis Management Advisor Guide: Overview of the different topic collections

Back to the article overview in the: Storm Topic Collection – Coping with Storm Damaged Timber